VOLTAGE OPTIMISATION

POWERPERFECTOR’S VPO® WAS DESIGNED AND MANUFACTURED WITH ENERGY EFFICIENCY IN MIND. IT IS A COMPLETELY PASSIVE UNIT WITH NO MOVING PARTS. MADE FROM ULTRA-HIGH-PURITY MATERIALS, IT DELIVERS 99.94% EFFICIENCY AT PEAK LOADING.

VPO® guarantees energy, cost and carbon savings by optimising a building’s electrical supply. This allows electrical equipment to operate more efficiently and consume less energy.
VPO® is unique – it is Voltage Optimisation with integrated power conditioning. A best in class technology designed specifically for energy efficiency and to protect your electrical equipment.

90% of UK buildings waste energy because their power is not optimised

VPO® is Voltage Optimisation with power conditioning.

Your entire building is supplied with an optimised voltage, cutting energy costs and carbon emissions.

VPO® reduces the maintenance burden and will extend the life of your electrical equipment

powerPerfector is unique because the power conditioning benefits, such as harmonic attenuation, transient protection and improved phase balancing, are intrinsic to the technology’s design, without the need for additional components or moving parts.

Bigger savings, more benefits and complete reliability

powerPerfector optimisers are manufactured in the UK from high quality materials to exacting standards and are designed specifically for energy efficiency and power conditioning. Our Voltage Power Optimisation units have a 100% ‘NO FAILURE’ record with over 5,000 installations in the UK and tens of thousands of installations worldwide.

powerPerfector units have no moving parts and are maintenance-free, with a life of 50 years.

powerPerfector optimisers are so efficient they do not require forced cooling and run at ambient temperature.
Harmonic suppression, improved phase balancing and transient protection are embedded within the unit, removing the need for bolt-ons or moving parts, which can fail.

With VPO® you can fit the technology with absolute confidence that the integrity of your supply will be improved, and your site will be running as efficiently as possible. Just as important as the design is the construction of the unit.

Case Studies

The National Portrait Gallery

The National Portrait Gallery specialises in displaying portraits of historically important British people. Since it was founded in 1856 its collection of portraits has grown to be the most extensive in the world.

The site at St Martin’s Place near Trafalgar Square houses a significant proportion of these, although many reside in other locations around the UK, including in a number of houses managed by the National Trust. The Gallery attracts nearly 2 million visitors a year.

Annual Savings: kWh: 12% | CO2: 207,769kg | £28,645 

The University of Winchester

Established in 1840, The University of Winchester is home to just under 6,000 students studying a broad range of programmes at both undergraduate and postgraduate level.

The West Downs Centre and Student Village are located just a few hundred metres away from the King Alfred Campus. A Grade II listed building, the West Downs Centre was renovated by the University in 2001, accommodation includes 14 syndicate and plenary rooms, 65 en‐suite bedrooms, dining and bar facilities as well as a reception space.

Annual Savings: kWh: 9-9.6% | CO2: 49,400kg | £9,220 

Richmond Royal Hospital

Since being formed in 1994, the South West London & St George’s Mental Health Trust has been based at Springfield University Hospital in Tooting.

It also operates from almost 100 other locations, providing mental health and community services to 39,500 people each year. The Trust is subject to Department of Health plans for Sustainable Development. After the Trust sent the annual electricity consumption details for Richmond Royal hospital, it was possible to give a provisional quote for a powerPerfector unit and the energy savings that would be expected.

Annual Savings: kWh: 11.4% | CO2: 29,800kg | £4,800 

Head Office, Derby:
Global Energy Efficiency Ltd, 15 The Wardwick, Derby DE1 1HA.
Telephone: 01332 345006

Copyright 2019 GEE Ltd